For reference books and articles relating to these pages, see our bibliography
Are you getting tired of looking at trains? Try the Mad Toy Collector's exhibition, or visit The Heraldry Guy!
Searching for a particular topic in these pages? Try our subject index (updated continually)
It's all being made into a serialized movie! Click here to watch the movie episodes!
Go to the Next Plate Go to the Previous Plate Go to the Numerical Plate Directory

Plate 234:  Wiring the point motors through the distribution center, Part 12: connecting one end of a jumper
(This plate added NOV 2003)

The U-shaped jumper wire shown in Plate 233 has been connected to column 1 of the the terminal block. The other end of the jumper must be connected to column 2. However, we do not connect this jumper to column 2 at this time, because the next jumper must share column 2 with this jumper. The screw that will fasten both this jumper and the next jumper to column 2 can be seen at the bottom of the picture.